This project consisted of structural alterations to the front of the property.

The client required a frameless glass frontage as well as some doors relocating and removal of structural walls to enable the construction of a single-story extension.

Our company supplied, designed, and installed the temporary propping, carried out the demolition work required to form openings, supplied and installed structural steel.