Testimonials

  • “Just to let you know that we have appreciated all the help and assistance with this project that you have given us over the past year and we would like to thank you all for the hard work and sometimes messy work you have carried out, please extend our gratitude to all the lads that have attended site, it has being a pleasure working with a professional company with equally professional operatives that carry out work to such a high standard and in such a harsh environment.”
    Andrew Bosman
    Project Manager, J.T. Mackley & Co
  • “We always use Denon Construction for our Temporary Works Projects. They deliver service, quality and value for money”
    Dave Jessop
    Project Manager, Marshall Construction
  • “Denon Construction has helped us on some of our biggest projects. Their service and professionalism is second to none”
    John Riggs
    Director, RPS Civils
  • “Walter Carefoot & Sons Ltd wish to thank you for all your efforts on our schemes, which enabled us to achieve handovers on the required dates, with Zero Defects. We look forward to working with yourselves in the future”
    Geoff Weldon
    Contract Manager, Walter Carefoot and Sons Ltd
  • “Denon Construction have worked on a number of fast-track refurbishment projects for us throughout the country providing structural propping services, on each occasion, they have provided fast, efficient service, high quality workmanship at a cost effective price. We would recommend them for any structural propping projects you are considering”
    Peter Durrans
    Director, Myriad Contracts Ltd
  • “Denon Construction carry out our temporary works and demolitions on prestigious London properties. We have found them to be extremely knowledgeable, competent, efficient and reliable. In addition they are straightforward people to work with so we will be working together on many future projects.”
    George Cubitt
    Cubitt Theobald Ltd
  • “We contracted with Denon Construction for the part demolition and associated temporary works for the listed building at the Baxter Gate project. We found Denon Construction to be knowledgeable in terms of their trade and skills and of their requirements in terms of temporary works design and the implementation of those temporary works in a safe and effective manner. We would have no hesitation in contracting again with Denon Construction for future contracts.”
    Kevin Mallon
    Contracts Planner, Gilbert Ash
  • “To enable the continued safe operation of Ferrybridge PowerStation during the dismantling of the Fire damaged FGD 4 unit we had a requirement to span over a critical sump with a bespoke Gantry System. We called on the expertise of Denon who supplied and installed the RMD propping system required to support the side walls of this sump. The installation had to carried out during a scheduled shutdown and required full confined space entry. The full system was installed and completed ahead of schedule. Weekly inspections and permit to load certifications were also provided by Denon. When the system was finished with and required removal, again this was completed ahead of schedule. I would recommend Denon for all of your temporary works installations and I look forward to working with them again.”
    Paul Hignett
    Project Manager, SSE – FDG 4 Demolition